US - Ironwood: Shelters replacement in Ironwood, MI

- Ironwood, USA, NA

1 Disconnect and remove from service Rnwy 27 Glide Slope (GS) shelter and dispose of offsite.

2 Install a Power and Control Rack (helical) with new meter and disconnects for GS and
AWOS. Re-connect AWOS to new disconnect ASAP; site personnel will maintain operation of AWOS with a portable generator while new rack is installed.

3 Remove all conduit/conductors from antenna mast, to include Lightning Down Conductor(s).

4 Remove existing UG duct/wiring into shelter, and any buried conductors, conduit, etc., that
will not be re-used, to include existing EES and interconnection conductor with AWOS EES.

5 Remove steps and foundation (note that existing foundation appears to be a flat slab, while
reference drawings show piers).

6 Regrade site and create a swale (North?) to prevent ponding at and around the shelter and antenna mast. Prep any disturbed areas with geotextile fabric and crushed aggregate

Questions regarding this requirement are due to van.ctr.nicholson@faa.gov by 21 June 2018 at 5:00pm CST.

Click for more info
Contracting authority
Department of Transportation, Federal Aviation Administration (FAA)
Location
Ironwood, USA, NA
Time-limit for receipt of tenders or requests to participate
Thursday, July 5, 2018 12:00 AM
Language(s) in which tenders or requests to participate may be drawn up
English
  • Join our community for FREE today!

  • Create and share your own profile

  • Join the discussions

  • Publish your own items

  • Subscription to our Weekly eNewsletter

your benefits?

Get connected with Mass Transit Professionals Worldwide

Create your account

Sign in with LinkedIn Close

FREE membership benefits

  • * create and share your own profile
  • * join the discussions
  • * publish your own items on Mass Transit Networkmanage news, jobs, tenders, companies, events, showcases, educations, associations and literature.
  • * subscribe to our weekly eNewsletter