HU - Pécs: Cycle path construction work

- Pécs, Hungary, Europe

Section II: Object

II.1)Scope of the procurement

II.1.1)Title:

Implementation of the western cycle path

Reference number: EKR000103392020
II.1.2)Main CPV code
45233162
II.1.3)Type of contract
Works
II.1.4)Short description:

The Municipality of the City of Pécs intends to carry out the development of a bicycle facility in the western part of Pécs in the project “TOP - 6 4 1-15 - PC1-2016-00004 - Sustainable urban transport development - Implementation of the cycle path in the western part of the city”. On Szigeti út, between Tüzér utca and Szántó Kovács János utca, Tettye Forrásház Zrt. Intends to carry out a water utility reconstruction in parallel with the project. Adapted to the asphalt pavement restoration planned during the reconstruction of Tettye Forrásház Zrt .; wear and tear restoration will be carried out as part of the cycling project.

II.1.5)Estimated total value
II.1.6)Information about lots
This contract is divided into lots: no

II.2)Description

II.2.1)Title:
II.2.2)Additional CPV code(s)
03452000
34928500
45112700
45231110
45232151
45233162
45233200
45233221
45233223
II.2.3)Place of performance
NUTS code: HU231
Main site or place of performance:

Pécs 652/6, 2584/1, 3204, 3203, 2583, 2585/4, 1913, 1810, 1368, 5623, 1420/1, 1560 hrsz. - Pécs Szigeti út, Páfrány utca Magyarürögi út, Rácvárosi út, Pellérdi út, Fő utca, Korsó utca, Vöröskő utca.

II.2.4)Description of the procurement:

The project will build 4.2 km of new cycling facilities.

Quantitative statement:

Demolition of asphalt pavement, removal of debris to landfill: 2,511 m 2

Milling of asphalt pavement (average thickness of 14 cm): 3,718 m 2

Metal street lighting column to be moved: 1 pc

Concrete electrical column to be moved: 1 pc

Metal support column to be moved: 1 pc

Removable lattice sink: 1 pc

Replacement of the cover of an existing lattice sink: 3 pcs

Relocation of pedestrian barrier: 12 sqm

Bus waiting relocation: 2 pcs

Design of a public lighting node: 3 pcs

Tree felling: 13 pcs

Production of road mirror: 2,665 m 2

Construction of a priority edging C 20 / 25-32 / FN min. with concrete base beam: 504 sqm

Recessed edging construction C 20 / 25-32 / FN min. with concrete base beam: 199 sqm

Construction of garden edging C 20 / 25-32 / FN min. with concrete base beam: 798 sqm

Construction of crushed sand bedding under paving: 20 m 3

CKt base layer construction: 381 m 3

Construction and compaction of sand gravel protective layer to Trr = 95% compaction: 533 m 3

Production of AC 8 wear asphalt layer with mechanical force: 72 m 3

Production of AC 11 abrasive asphalt layer by mechanical force: 11 m 3

Production of C 11 bonding asphalt layer by mechanical force: 13 m 3

8 cm vtg. Gray paving construction: 24 m 2

6 cm vtg. Gray paving construction: 631 m 2

Production of AC 16 / F wearing asphalt layer by machine force (6 cm vtg.): 223 m 3

Production of C 22 / F bonding asphalt layer by machine force (8 cm vtg.): 298 m 3

Landscaping, humus application, lawn: 2,700 m 2

Planting deciduous trees in a planting pit: 30 pcs

Painting of pavement signs with yellow permanent paint: 310 m 2

Painting of pavement signs with white permanent paint: 340 m 2

Reconstruction of road signaling equipment: 1 pc

Leveling of utility fittings: 70 pcs

The planning area will receive a new pavement in connection with the renovation of the pavement and roadway structure of Szigeti út in the framework of the project “Implementation of the cycle path of the western part of the city TOP-6.4.1-15-PC1-2016-00004”. Prior to this construction work, the pipeline must be reconstructed accordingly, in order to ensure the safe supply of condominiums continuously being built on the street, taking into account the increased water demand. The renovation plan of the aqueduct was prepared by Tettye Forrásház Zrt. In its own design, the plan has a water rights construction permit: B. LXXIII / 211-CCCLVI

Total length of backbone to be replaced:

As a reconstruction: DN 110 Blutop 680 fm

Construction of a new pipeline: DN 110 Blutop 74 sqm

Construction of a new pipeline: DN 90 KPE 25 sqm

Reconstruction: DN 90 Blutop 24 fm

Rekonstrukcióként: DK 110 KPE 77 fm

Planned fire hydrant positions: DK 90 PE 100 SDR 11 (2 pcs.) 7 sqm

Replacement of connections: Dk 40 KPE connections 34 pcs 362 fm

Remaining connections (11pcs)

Protective tube DK 225 KPE 102 fm

Protective tube DK 160 KPE 5 fm

Detailed information related to the construction work and the detailed definition of the tasks, technical and material quality requirements and quantities are included in the design documentation, technical description, building permit, unpriced budgets and the Customer's requirements sent as an annex to the KD.

II.2.5)Award criteria
Criteria below
Quality criterion - Name: Duration of the additional guarantee (error reporting period) given in whole months (months) (min. 0 months; max. 24 months) / Weighting: 10
Quality criterion - Name: The professional presented for the certification of the sub-member specified in sub-paragraph M.2.1) has the experience of the additional subject in addition to those specified therein throughout the month (min. 0, max. 36 months) / Weighting: 10
Quality criterion - Name: The professional presented for the certification of the sub-member specified in sub-paragraph M.2.2) has the experience of the additional subject in addition to those specified therein throughout the month (min. 0, max. 36 months) / Weighting: 10
Price - Weighting: 70
II.2.6)Estimated value
II.2.7)Duration of the contract, framework agreement or dynamic purchasing system
Duration in months: 6
This contract is subject to renewal: no
II.2.10)Information about variants
Variants will be accepted: no
II.2.11)Information about options
Options: no
II.2.12)Information about electronic catalogues
II.2.13)Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds: yes
Identification of the project:

TOP-6.4.1-15-PC1-2016-00004

II.2.14)Additional information

AT to III III.3.3) M.2. The professional CV, graduation certificate and order of the SZEs provided for in point 2-3 of the MK must be attached to the tender. under the recommendation for. If AT does not attach the above documents to its tender by the deadline for submission of tenders v. does not name SZE in any other way, its offer is Kbt. Section 73 (1) (e).

Click for more info
Contracting authority
Pécs Megyei Jogú Város Önkormányzata
Location
Pécs, Hungary, Europe
Time-limit for receipt of tenders or requests to participate
Tuesday, June 16, 2020 12:00 AM
Language(s) in which tenders or requests to participate may be drawn up
Hungarian
  • Join our community for FREE today!

  • Create and share your own profile

  • Join the discussions

  • Publish your own items

  • Subscription to our Weekly eNewsletter

your benefits?

Get connected with Mass Transit Professionals Worldwide

Create your account

Sign in with LinkedIn Close

FREE membership benefits

  • * create and share your own profile
  • * join the discussions
  • * publish your own items on Mass Transit Networkmanage news, jobs, tenders, companies, events, showcases, educations, associations and literature.
  • * subscribe to our weekly eNewsletter